Bayou Corne/Grand Bayou Response Activity
Tuesday, May 13 work-
Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.
Air Monitoring/Sub-slab Sampling and Ventilation
– Conducting ventilation system inspections
ORW/CPT Wells
– Continuing pumping on ORWs 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)
– Conducting workover of ORW 4 (northwest of containment berm)
– Collecting samples from aquifer monitoring wells
– Surveying CPT locations
Containment/ Roads/ Sinkhole/Survey
– Conducting daily berm inspections
– Clearing overgrowth from well and flare locations
– Collecting samples from sinkhole inflow locations
– Cleaning out seismic monitoring station LA 14 (Oxy 9 well pad)
– Re-installing sensor for seismic monitoring station LA 11 (Oxy 10 well pad)