Bayou Corne/Grand Bayou Response Activity
Tuesday, April 29 work-
Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.
Air Monitoring/Sub-slab Sampling and Ventilation
– Conducting ventilation system inspections
ORW/CPT Wells
– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)
– Working over ORW 19 (west of containment berm)
– Building pad for pressure monitoring well and cone penetrometer test on south side of ORW 57 access road (southeast of Oxy 9 well pad)
Containment/ Roads/ Sinkhole/Survey
– Installing rip-rap on new south containment berm
– Checking water level data loggers
– Checking tiltmeters around sinkhole
– Relocating survey reflectors near sinkhole
– Grading road to ORW 54 (west of Bayou Corne, south of La 70)