1:10 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Tuesday, April 29 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

 

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

 

ORW/CPT Wells

– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)

– Working over ORW 19 (west of containment berm)

– Building pad for pressure monitoring well and cone penetrometer test on south side of ORW 57 access road (southeast of Oxy 9 well pad)

 

Containment/ Roads/ Sinkhole/Survey

– Installing rip-rap on new south containment berm

– Checking water level data loggers

– Checking tiltmeters around sinkhole

– Relocating survey reflectors near sinkhole

– Grading road to ORW 54 (west of Bayou Corne, south of La 70)

Advertisement

11:35 a.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Monday, April 28 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)

Containment/ Roads/ Sinkhole/Survey

– Installing silt fence near new south containment berm

– Stockpiling clay for containment berm

9:35 a.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Friday, April 25 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)

– Re-installing pump in ORW 14

Containment/ Roads/ Sinkhole/Survey

– Stockpiling sand for containment berm

– Conducting depth and pressure logging of Oxy 3A (working from Oxy 9 well pad)

2:45 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Thursday, April 24 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)

– Re-working ORW 14

Containment/ Roads/ Sinkhole/Survey

– Conducting surface water sampling

– Stockpiling sand for containment berm

– Surveying south containment berm re-route

 

3:15 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Wednesay, April 23 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)

– Redeveloping ORW 14 with nitrogen

– Removing pump from ORW 26 (north of containment berm)

– Installing pressure transducer in ORW 9 (west of containment berm)

Containment/ Roads/ Sinkhole/Survey

– Conducting sinkhole water profile

– Compacting limestone on south containment berm re-route

– Placing riprap on slope areas of south containment berm re-route

– Surveying south containment berm re-route for final elevation

– Installing pressure gauges on DPVE for Bubble Site 53 (south of Oxy 10 well pad)

– Venting DPVE for Bubble Site 26 (near Oxy 2 well pad)

2:40 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity
Monday, April 21 work-
Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation
– Conducting ventilation system inspections

ORW/CPT Wells
– Continuing pumping on ORWs 4 (northwest of containment berm), 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street), 48 (north of containment berm) and 54 (west of Bayou Corne, south of La 70)

1:00 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Thursday, April 17 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Continuing pumping on ORWs 4 (northwest of containment berm) and 54 (west of Bayou Corne, south of La 70)

– Working on pumps for ORWs 14 (Oxy 9 well pad), 15 (north of La 70, east of Gumbo Street) and 48 (north of containment berm)

– Conducting drawdown test on ORW 14 (Oxy 9 well pad)

Containment/ Roads/ Sinkhole/Survey

– Performing sinkhole cleanup

– Placing geotextile fabric and limestone on south containment berm re-route