2:00 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity
Monday, March 31 work-
Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation
– Conducting ventilation system inspections

ORW/CPT Wells
– Continuing de-watering test on ORWs 4 (northwest of containment berm) and 14 (Oxy 9 well pad), 48 (north of containment berm) and OGRW 1 (Oxy Geismar 2 well pad)
– Performing pump maintenance on ORW 4
– Ending pump test on ORWs 1 and 32 (north of La 70, east of Gumbo St.)
– Continuing pump test on ORW 2 (north of La 70, east of Gumbo St.)
– Flushing out ORW 15 (north of La 70, east of Gumbo St.)
– Cleaning screen and filter on ORW 52 (west of Bayou Corne, south of La 70

Containment/ Roads/ Sinkhole/Survey
– Grading south containment berm re-route and preparing for compaction test

Advertisement

11:50 a.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Friday, March 28 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections 

ORW/CPT Wells

– Removing pump from ORW 21 (north of Sauce Piquante, west of Crawfish Stew)

– Continuing de-watering test on ORWs 4 (northwest of containment berm) and 14 (Oxy 9 well pad), 48 (north of containment berm) and OGRW 1 (Oxy Geismar 2 well pad)

– Installing new pumps on ORWs 4 and 14

– Continuing pump test on ORWs 1 and 32 (north of La 70, east of Gumbo St.)

– Beginning pump test on ORW 2 (north of La 70, east of Gumbo St.)

– Installing water lines for ORWs 1, 2, 32

– Conducting depth log on Oxy Geismar 3A (working from Oxy 9 well pad)

Containment/ Roads/ Sinkhole/Survey

 – Continuing work on south containment berm reroute

4:30 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Thursday, March 27 work-
Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3 following Wednesday sloughing event.

Air Monitoring/Sub-slab Sampling and Ventilation
– Conducting ventilation system inspections

ORW/CPT Wells
– Moving water tank off ORW 21 (north of Sauce Piquante, west of Crawfish Stew)
– Continuing de-watering test on ORWs 4 (northwest of containment berm) and 14 (Oxy 9 well pad), 48 (north of containment berm) and OGRW 1 (Oxy Geismar 2 well pad)
– Continuing pump test on ORWs 1 and 32 (north of La 70, east of Gumbo St.)
– Working over ORW 39 (north of containment berm)
– Depressurizing Oxy Geismar 3A (working from Oxy 9 well pad)

6:25 p.m. Slough In @ Sinkhole

At approximately 3:45 this afternoon, a burp and slough-in occurred on the sinkhole. Debris is present and floating on the sinkhole and trees near Pad #3 sloughed in. A slight odor of hydrocarbons is present in the Bayou Corne community. As information develops, it will be shared here.

1:25 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Wednesday, March 26 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Ending ORW 21 pump test (north of Sauce Piquante, west of Crawfish Stew)

– Continuing de-watering test on ORWs 4 (northwest of containment berm) and 14 (Oxy 9 well pad), 48 (north of containment berm) and OGRW 1 (Oxy Geismar 2 well pad)

– Continuing pump test on ORWs 1 and 32 (north of La 70, east of Gumbo St.)

– Flushing out ORW 39 (north of containment berm)

– Installing electrical equipment ORW 57 (southeast of Oxy 9 well pad)

– Depressurizing Oxy Geismar 3A (working from Oxy 9 well pad)

Containment/ Roads/ Sinkhole/Survey

– Continuing work on west end of south containment berm reroute, covering geotextile fabric with clay

1:35 p.m. Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Monday, March 24 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and within containment berms. Seismic monitoring indicates continued low levels of subsurface activity near sinkhole/Oxy 3.

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections 

ORW/CPT Wells

– Continuing ORW 21 pump test (north of Sauce Piquante, west of Crawfish Stew) and surveying settlement plates

– Repositioning pumps for de-watering test on ORWs 4 (northwest of containment berm) and 14 (Oxy 9 well pad)

– Conducting pump test on ORWs 24 (north of La 70, east of Sauce Piquante and Gumbo St intersection) and 32 (north of La 70, east of Gumbo St.)

Containment Berm/Roads/Sinkhole

– Continuing work on western end of new south containment berm

– Surveying containment berms and settlement plates