Bayou Corne/Grand Bayou Response Activity

Wednesday, Dec. 4 work-

Sinkhole Activity Code 1 – indicating work is allowed on sinkhole and containment berm, seismic monitoring indicates low levels of sub-surface activity near sinkhole/Oxy 3

Air Monitoring/Sub-slab Sampling and Ventilation

– Conducting ventilation system inspections

ORW/CPT Wells

– Finishing development of ORWs 52 and 52 (west of Bayou Corne, south of La 70) and installing transducers

– Beginning  development of ORWs 49 and 50 (Sportsman’s Landing)

– Completing passive vent well NSDBS 56 (near bubble site 56 on Bayou Corne, north of La 70)

– Removing water from ORW 10 (west of containment berm) to increase gas flow

– Surveying settlement plate near DPVE 47 test site (west of containment berm)

Containment Berm/Roads/Sinkhole

– Surveying containment berm settlement plates

– Surveying south containment berm

– Transferring water from swamp to sinkhole

– Continuing south containment berm repairs, placing clay over grouted areas