Bayou Corne/Grand Bayou Response Activity
Tuesday, Aug. 20 work-
Sinkhole Activity Code 1 – lowest level, indicating little seismic activity detected near sinkhole/Oxy 3
– Ending pressure monitoring at 1469 Sauce Piquante and 1438 Sauce Piquante
– Taking measurements of 174 Crawfish Stew for sub-slab ventilation system
– Retrofitting ventilation system stack to the new lower profile at 135 Crawfish Stew
– Continuing pressure monitoring at 1467 Sauce Piquante, 1469 Sauce Piquante, 121 Sportsman’s Drive and 174 Crawfish Stew
– Installing sub-slab vapor monitoring probe at 174 Crawfish Stew
ORW/CPT Wells
– Removing water on ORWs 13 (Oxy 10 well pad), 16 (west of containment berm) and 32 (south of La. 70, west of Texas Brine facility)
– Beginning installation of ORW 42 (south of La. 70, west of Texas Brine facility)
– Completing
Containment Berm/Roads/Sinkhole
– Placing clay on the south containment berm
– Placing drainage feature in the southeast corner of the south berm at Oxy 9 well pad
– Installing CPT 72 (South of Sauce Piquante)