1:40 p.m. Activity Update from the Office of Conservation

Bayou Corne/Grand Bayou Response Activity

Monday, Aug. 19 work-

Sinkhole Activity Code 1 – lowest level, indicating little seismic activity detected near sinkhole/Oxy 3

– Continue pressure monitoring at 121 Sportsmans Drive and 1469, 1467, and 1438 Sauce Piquante

– Conducting ambient and in-stack monitoring of sub-slab ventilation systems at 116 and 135 Crawfish Stew and 1433 Sauce Piquante

– Retrofitting ventilation system stack to the new lower profile at 116 Crawfish Stew

 

ORW/CPT Wells

– Removing water on ORWs 15, 24 (north of La. 70, west of Texas Brine facility), and 17 (west of containment berm)

– Completing CPT 73 (north of La. 70, west of Texas Brine facility) and MIHPT 70 (behind Sportsman’s Landing)

 

Containment Berm/Roads/Sinkhole

– Placing clay on the south containment berm

– Placing drainage feature in the southeast corner of the south berm at Oxy 9 well pad